Province | Subbasin | % |
---|---|---|
Columbia Plateau | Columbia Lower Middle | 100.00% |
Previous: | Next: |
---|---|
73354 REL 50: 2007-155-00 EXP DEVELOP A MASTER PLAN FOR A REARING FACILITY |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Contract Development & Direction | B: 119. Contract Development and Direction | 08/31/2022 | 08/31/2022 | |
Step 2: Master Plan Revisions | C: 196. STEP 2: Master Plan Step 2 Tasks | 08/31/2022 | ||
Sturgeon Working Group | D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | 08/31/2022 | 08/31/2022 | |
Step 2 Environmental Compliance Documents | E: 165. STEP 2: Assist with NEPA process contracted by BPA | 08/31/2022 | ||
Completed Water Plan for the Sturgeon Master Plan Facility | F: 174. Water Evaluations at Marion Drain Hatchery Site | 08/31/2022 | ||
Provide input to preliminary design process for the Marion Drain Sturgeon Facility | G: 175. Preliminary Design of the Marion Drain Sturgeon facility | 08/31/2022 |
Primary Focal Species | Work Statement Elements |
---|---|
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | Contract Development and Direction | |||||||
C | 196 | STEP 2: Master Plan Step 2 Tasks | |||||||
D | 189 | Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin | |||||||
E | 165 | STEP 2: Assist with NEPA process contracted by BPA | |||||||
F | 174 | Water Evaluations at Marion Drain Hatchery Site | |||||||
G | 175 | Preliminary Design of the Marion Drain Sturgeon facility | |||||||
H | 132 | Annual progress report not required |